Sunrise Drive Cafeteria

Sunrise Drive Cafeteria - Terrazzo Stone floor

Pictures are worth a thousand words.

 

  • The Terrazzo Stone Floor Installation

    Now that the heat is working in the new Sunrise Drive cafeteria, the temperature is warm enough for the Terrazzo stone floor installation. This job is expected to take three weeks. 

 

 


 

 

 


 

 


 

  • The Facia   The facia is done on the west side, so the facia work continues on the north side.